Blog The Practical Guide ...
profile of the author - Jaimy Carter
Jaimy Carter 02/19/2025 • Last Updated

The Practical Guide – Choosing and Implementing the Right Method for Your Team • Part 3

Get a practical framework for choosing Kanban or Gantt, plus best practices to implement the right method for your team or project.

Rear view of a man using a laptop against a city backdrop in late-afternoon light

In Part 2, we explored various scenarios and weighed the pros and cons of Kanban vs. Gantt in each. By now, you likely have an inkling which approach might suit your project. Part 3 will help you confirm that choice and, more importantly, guide you through implementing it effectively. We’ll present a structured decision-making framework to choose between Kanban, Gantt, or a hybrid approach, ensuring you consider all key factors. Then, we’ll dive into practical steps for rolling out Kanban (as it often requires a cultural shift and new tools), especially in a digital workspace environment. We’ll also touch on how tools like Tooling Studio’s Kanban Tasks can simplify this transition by embedding Kanban into your team’s daily tools. Lastly, we’ll offer tips and best practices for managing the change – whether you’re introducing Kanban to a traditional team, adding Gantt planning to an agile team, or transitioning to any new project management method.

Decision Framework: Selecting Kanban, Gantt, or a Hybrid Approach

Choosing the right project management method isn’t a one-size-fits-all decision. It helps to systematically evaluate your project and team against certain criteria. Below is a step-by-step framework you can use to decide:

Step 1: Clarify Project Objectives and Constraints
Begin by clearly articulating what success looks like for your project. Is there a hard deadline (an external event or client date) that must be met? Is the scope fixed or flexible? Are incremental deliveries valuable, or is only the final deliverable of importance?

For example, if your objective is “deploy a new feature by Black Friday sale”, time is critical – a Gantt timeline can help backtrack and allocate tasks to meet that date. If instead your objective is “continuously improve our app’s user experience over the next year”, Kanban would enable the team to regularly pick up and complete UX improvement tasks without a rigid sequence.

Step 2: Analyze Task Structure and Dependencies
List out the major tasks or work items involved and note any dependencies. Are there tasks that can only start after others finish? How interdependent is the work?

  • If your project has many sequential or interdependent tasks, especially across different contributors, a Gantt chart will help coordinate those dependencies. It’s explicitly designed to handle linked tasks and schedule them optimally (Kanban Boards vs Gantt Charts: What to use? | Cloud Coach).
  • If tasks are largely independent or can be broken down into small chunks that various team members can tackle in parallel, Kanban can give those executors more freedom to self-manage the flow. Independent or loosely coupled tasks flow well on a Kanban board, where each can be picked up as soon as someone is free, without waiting for a global plan update (Kanban Boards vs Gantt Charts: What to use? | Cloud Coach).

For instance, in a construction project, tasks like “pouring concrete” must precede “building frame” – a Gantt would clearly enforce that. In a creative content team, one writer’s blog post doesn’t usually block another’s podcast creation; both can proceed via Kanban independently.

Step 3: Consider Team Work Style and Culture
Assess your team’s current work style. Do they prefer formal planning or more autonomy? Are they accustomed to daily stand-ups and iterative work (Agile culture), or do they work against detailed project plans (traditional PMO culture)?

  • Teams that thrive on Agile, self-organizing principles will find Kanban a natural extension. It gives individuals autonomy to choose tasks and manage flow, which can boost engagement and leadership at all levels (Kanban vs. Gantt Charts: Which Is Best for Your Team?). Such teams might resist a heavy Gantt process as it could feel like micromanagement or a slowdown.
  • Teams that are used to structure, predictability, and top-down planning might do well with a Gantt approach. They may appreciate the clarity of assigned timelines and the comfort of having a blueprint to follow. These teams might find a pure Kanban approach too ambiguous at first (“when will we be done?”).

Also consider stakeholders: If your management expects to see Gantt charts or timeline reports, you might need to produce those, or educate them on Kanban metrics if you go that route.

If your team is mixed or you have to accommodate both preferences, a hybrid approach could be a compromise: use Kanban internally to manage work, but translate the progress into a timeline for reporting. As noted earlier, some methodologies blend these (Water-Scrum-Fall) to satisfy both needs (Kanban Boards vs Gantt Charts: What to use? | Cloud Coach).

Step 4: Evaluate Project Scale and Complexity
Is your project small (a few weeks, a single team) or large (months/years, multiple teams)? Larger projects often involve more complexity that might benefit from Gantt planning at least at a macro level. Complex projects often have phases and sub-projects where a high-level Gantt shows how it all fits together.

  • For a small team/project, Kanban might be sufficient and much simpler to implement. You might not need the overhead of a Gantt for a 3-person, 1-month project – a Kanban board or simple task list could be enough to track everything and allow flexibility.
  • For a large project or program, consider a layered approach: perhaps a master Gantt for high-level milestones and a Kanban or Scrum boards for individual teams. If the project is complex but you still favor agile execution, you can combine approaches (many organizations do exactly this). The key is not to let the Gantt plan get so granular that it stifles the teams, nor to let the team boards float with no synchronization, causing misalignment. A hybrid lets you have a coarse-grained plan with fine-grained agile execution.

Step 5: Identify Tool Ecosystem and Integration Needs
What tools does your team already use, and how will a new method integrate? If your team lives in Jira or Trello, you already have Kanban capabilities at your fingertips. If you use Microsoft Project or an ERP system, Gantt charts might be readily available.

Consider also where your team communicates and tracks work: email, spreadsheets, dedicated PM software, etc. If adopting Kanban, will you use a physical board or digital tool? (For remote teams, digital is a must.) If adopting Gantt, do you have software to create and share the charts?

As an example, a team deeply embedded in Google Workspace might opt for a Kanban solution that ties into Google (like the Kanban Tasks extension) to avoid siloed tools. This way, tasks stay integrated with their emails and calendars. On the other hand, a company that already invested in a robust PM tool with Gantt functionality might leverage that for new projects (to maximize ROI on existing tools and training).

Step 6: Consider Future Evolution (Flexibility vs. Planning)
Think about the likely evolution of the project. Are changes and course-corrections expected? Or is it pretty well defined and unlikely to change?

  • If lots of change is anticipated (e.g., an R&D project where outcomes are uncertain, or a software project in a volatile market), favor Kanban or at least an Agile approach. It will handle change with grace – you’ll simply reprioritize or add new cards as needed, without a huge planning shock.
  • If the project is straightforward and change is minimal (e.g., compliance-driven projects with clear steps, or repeating projects similar to previous ones), a detailed plan (Gantt) can be followed with confidence and without much churn.

Also, consider if you might start with one method and later need to shift. It’s generally easier to add a Gantt view to a running Kanban project (by summarizing tasks and dates after the fact) than to break a rigid Gantt plan into a Kanban mid-way (though that can be done if you decide you need more agility). So, some teams start agile and only add Gantt if needed for oversight.

After working through these steps, you should have a clearer inclination. To illustrate, imagine a scenario: You manage a customer implementation project at a SaaS company. It’s a 3-month effort with a hard deadline (client training scheduled), involving setting up software, customizing features, and data migration. Using the framework: the objective is fixed (deadline), tasks have dependencies (data must be migrated before training), team is used to structured client projects, project scale is moderate with cross-functional work, changes are possible if client requests differ but mostly scope is defined. This analysis would point towards using a Gantt chart to plan and track the timeline (to ensure the client deadline is hit), possibly supplemented with a Kanban board for the engineering team’s portion if they prefer to manage their development tasks in agile fashion. The hybrid might be: a master Gantt for the client implementation phases and a Kanban for the development tasks feeding into those phases.

On the other hand, if the same SaaS company is running an internal innovation initiative with no fixed timeline, just a goal to prototype new features, with a small team that likes autonomy – that would lean strongly to Kanban (or Scrum sprints) with no Gantt needed.

With the decision made, the next step is implementation. Let’s assume many readers will be moving into Kanban (given its popularity in modern teams and the context of integrating with tools like Google Workspace). We’ll focus on how to implement Kanban effectively, but will also note what to do if you chose Gantt or a hybrid.

Implementing Kanban Effectively in Your Team

Adopting Kanban is more than just creating a board and moving cards. To get the full benefit, you should follow some best practices. Below is a step-by-step guide to implementing Kanban in a digital workspace, which can be adapted whether you use Tooling Studio’s Kanban Tasks inside Google Workspace or another Kanban tool.

1. Set Up Your Kanban Board (Digital or Physical):
Create a Kanban board with the basic columns that represent your workflow. A common starting template is To Do – In Progress – Done. You can adjust these to fit your context (for example, software teams might use “Backlog – Developing – Testing – Deployed”; a content team might use “Idea – Drafting – Editing – Published”). Keep it simple at first. If you’re using a digital tool, create a board in that app (for Google Workspace users, after installing Kanban Tasks, you’d see an option to create boards within Gmail or Google Tasks interface (Kanban Tasks - A native Kanban Board in your Google Workspace)). If physical, grab a whiteboard or wall and some sticky notes.

2. Define What Each Column Means:
Clarity is key. Take a moment to define the criteria for a card to move from one column to the next (these are your “policies”). For example, what does “Done” mean? (Is it deployed, approved by client, merged into master branch, etc. – define it). What counts as “In Progress”? If a task is waiting on someone’s feedback, does it stay In Progress or move to a “Blocked” or “Review” column? Make policies explicit to avoid confusion (Gantt Chart vs. Kanban Board: Pros, Cons, Similarities & Differences). Many Kanban teams add a column for “Blocked” or use visual signals (like a red tag) to denote blocked tasks – consider this if you often have waiting states.

3. Populate the Board with Current Work:
Add your current tasks as cards on the board. If you have existing to-do lists or a backlog, bring them in. Prioritize the “To Do” column (or backlog input queue) so it’s clear what’s most important. At this stage, involve the team – maybe have a kickoff meeting where everyone writes down what they’re working on and places it in the appropriate column. If using an integrated tool like Kanban Tasks in Google Workspace, you might import tasks from Google Tasks or create cards from important emails (Kanban Tasks - A native Kanban Board in your Google Workspace). The idea is to get a snapshot of all work in one place.

4. Set Work-in-Progress (WIP) Limits (if applicable):
Decide if you will enforce WIP limits on any columns (particularly the “In Progress” column). For starters, you might say each person can have at most 2 tasks in progress at a time, or as a team, we don’t want more than, say, 5 items in “In Progress” simultaneously. WIP limits are crucial to prevent overcommitment and to reveal bottlenecks (Kanban vs. Gantt Charts: Which Is Best for Your Team?). Start with reasonable limits and you can adjust as you learn your team’s capacity. Many teams skip WIP limits initially to not over-complicate, but even an informal agreement like “let’s try not to multitask too much” helps. If you do set limits, most digital Kanban tools allow you to configure them and will highlight if exceeded.

5. Establish a Cadence for Review and Prioritization:
Kanban doesn’t prescribe meeting routines like Scrum does, but it’s wise to set up a regular check-in. Perhaps a daily stand-up where the team quickly looks at the board: “What’s in progress? Any blockers? What can move today?” This keeps the board up-to-date and issues visible. Also plan for replenishment meetings – e.g., once a week review the backlog (To Do column) and refill it with new priorities if it’s running low, or re-prioritize if needed. The beauty of Kanban is you add process as needed – some teams hold a weekly or bi-weekly retrospective to discuss flow and suggest improvements (consistent with Kanban’s continuous improvement ethos). Find a rhythm that suits your team’s complexity.

6. Encourage Team Ownership:
Kanban works best when the team feels the board is theirs. Encourage team members to move cards themselves as they progress, to pull new work when they have capacity, and to flag problems on the board (like moving a card to “Blocked” if they hit a snag). This engagement creates buy-in. Management should refrain from treating the board as just a reporting tool and instead use it to empower discussions. For instance, if a manager sees an overloaded column, instead of blame, have a conversation: “It looks like testing has a lot of items. Do we need to adjust something to help throughput?” The team and manager together can adjust the process (maybe add another tester or find ways to automate tests, etc.). This collaborative approach helps overcome the cultural shift barrier that experts like Tsonev mentioned – it turns Kanban into a team asset rather than a top-down mandate (Kanban vs. Gantt Charts: Which Is Best for Your Team?).

7. Leverage Tool Integrations:
If you’re using a digital Kanban tool, take advantage of its integrations and features:

  • For example, with Tooling Studio’s Kanban Tasks, you can convert emails into tasks easily (Kanban Tasks - A native Kanban Board in your Google Workspace). That means if a client emails a request, you can make it a card on your board with one click, ensuring it’s tracked. Encourage this habit so important communications become actionable tasks on the board.
  • Use notifications and due dates if available. Kanban boards typically focus on flow rather than due dates, but if your tool allows due dates on cards (many do), use them sparingly for time-sensitive tasks. This can help marry some timeline awareness into Kanban.
  • If your team uses Google Chat or Slack, see if your Kanban tool can send updates to a channel (e.g., “Card X moved to Done”). This keeps Kanban visible even to those who might not check the board often and fosters a culture of celebrating completed tasks.
  • Utilize tags or labels on cards for categorization (e.g., high priority, bug, feature, content type) – this can help filter the board during reviews.
  • Ensure everyone has access and knows how to use the tool. Perhaps run a short demo. The guide provided by Tooling Studio on using Kanban in Google Workspace can be a resource for the team to self-learn the extension’s features. The tool is designed to be intuitive and feel native to Google users, reducing the learning curve (Kanban Tasks - A native Kanban Board in your Google Workspace).

8. Monitor Flow and Adapt:
Once the board is in use, observe how work flows. Do tasks move smoothly or linger in one column? If you notice consistently that, say, tasks get stuck in “Review”, maybe you need to adjust your process (e.g., allocate more reviewer time or add a “Ready for Review” buffer column to signal need). Kanban metrics can help if you want to get quantitative: track cycle time (how long cards stay from start to finish) or throughput (cards completed per week). You don’t need to dive into metrics immediately, but even qualitatively you can see patterns. Have the team discuss these in retrospectives. Perhaps WIP limits need to be tightened or loosened. Maybe you realize a new column would clarify work stages (for example, splitting “In Progress” into “Coding” and “Testing” for clarity). Implement these changes gradually – that’s the idea of continuous improvement (Kaizen). Small tweaks over time can significantly enhance your process efficiency. For example, a team might find that after limiting WIP, their completion rate improved because they focused better (Kanban vs. Gantt Charts: Which Is Best for Your Team?).

9. Manage External Expectations:
If you chose Kanban but have stakeholders who want timelines, proactively manage this. You might periodically produce a high-level Gantt or timeline for them, or use projections based on your Kanban throughput (“we complete ~5 tasks per week, here’s an estimated timeline for the next milestones”). Communicate that the team is using an Agile Kanban approach to deliver value continuously and that the focus is on flow; however, you will keep them informed on progress. Often, stakeholders become comfortable when they see a steady stream of output and a transparent board, even if it’s not a traditional Gantt chart. Some Kanban tools have reporting charts (like cumulative flow diagrams or cycle time scatterplots) – you can share those to provide confidence with data that work is moving predictably.

10. Pilot and Scale:
If this is a new approach for your organization, consider piloting Kanban with one team or project first. iron out the kinks, gather success stories, then expand to others. This approach demonstrates value and creates internal advocates. The pilot team can then mentor others. If you’re integrating Kanban in Google Workspace through Tooling Studio’s extension, perhaps start with a small department that heavily uses Google Tasks, showcase how it improved their task management (maybe they report time saved or better task visibility), and then invite other teams to try.

Throughout implementation, maintain a professional yet consumable tone with your team about the changes. Emphasize that Kanban is a means to make work easier to manage and more transparent, not an onerous new protocol. Encourage feedback – as Tsonev noted, Kanban adoption is a cultural shift and some may be hesitant (Kanban vs. Gantt Charts: Which Is Best for Your Team?). Listen to concerns (e.g., “Do we have to put all our tasks on the board?” or “What if I have a task that doesn’t fit these columns?”) and address them. Perhaps not every tiny task goes on the board (some teams use a threshold like any task >1 day of work gets a card). You can adjust policies to make Kanban useful, not burdensome.

Implementing Gantt (If Chosen):

If your decision favored Gantt, implementation involves creating the Gantt chart and ensuring it’s used effectively:

  • Choose a tool (MS Project, online tools like Smartsheet, GanttPRO, or even spreadsheets for simpler plans).
  • Define your Work Breakdown Structure (WBS): break the project into phases, deliverables, and tasks. Get input from team members for realistic task durations.
  • Enter tasks with durations, set dependencies (predecessors/successors), and assign responsible persons or resources to each task.
  • Set key milestones and adjust the timeline to meet any fixed dates (you may need to compress sequences or add overlap if initial draft doesn’t meet the deadline).
  • Review the Gantt with the team so everyone understands the plan and their roles. Make sure to highlight the critical path tasks – these are the ones that cannot slip without affecting the deadline (Gantt Chart vs. Kanban Board: Pros, Cons, Similarities & Differences).
  • Use the Gantt for weekly (or regular) project reviews. Update percent completes or actual finish dates as tasks progress. If something falls behind, the Gantt will show new projected dates – communicate these changes quickly and decide on corrective actions (e.g., reassign work, fast-track by doing tasks in parallel, or accept a new timeline).
  • Don’t forget to still engage the team in problem-solving; a Gantt shouldn’t become a blame instrument (“your task is late!”) but rather a tool to visualize and adjust plans. Keep some agility by updating the plan as a living document, not a fixed contract set in stone at the beginning.
  • If you have a hybrid with some Kanban sub-work, ensure integration: e.g., the Gantt’s tasks could be larger buckets that correspond to multiple Kanban cards. Periodically roll up the Kanban progress into the Gantt (perhaps mark a Gantt task complete when all its Kanban cards are done).

Harnessing Tooling Studio’s Kanban Tasks for Seamless Integration

As teams increasingly work across various apps and remote locations, having project management tools that integrate seamlessly with everyday software can be a game-changer. Tooling Studio’s Kanban Tasks is a prime example for Kanban integration in Google Workspace. If your team uses Gmail, Google Calendar, and Google Drive frequently, here’s how Kanban Tasks can simplify task management:

  • Inside Gmail: Once installed, Kanban Tasks adds a panel in Gmail where you can view and manage your boards (Kanban Tasks - A native Kanban Board in your Google Workspace). Say you receive an email requesting a task – instead of that request getting lost in your inbox, you can immediately add it as a Kanban card on your board (there’s a “Add to Kanban” button). This ties your communication to your workflow in one step.
  • Google Tasks Sync: Kanban Tasks is built on Google Tasks, meaning it syncs with your existing tasks data (Kanban Tasks - A native Kanban Board in your Google Workspace). If you already use Google Tasks for personal to-dos, Kanban Tasks will visualize them on a board. Likewise, anything you add via Kanban Tasks is stored in Google Tasks. This synchronization ensures you’re not duplicating data and you can always fallback to Google’s native interface if needed.
  • Real-Time Collaboration: The extension allows sharing boards with your team members. Multiple people can work on the board and see updates in real-time, much like how Google Docs collaboration works. Assign tasks to team members, add due dates, comments, and attachments to cards – all within Gmail’s environment (Kanban Tasks - A native Kanban Board in your Google Workspace). By keeping collaboration in one place, you avoid the scenario of having an external Kanban app that not everyone remembers to check.
  • Visual and User-Friendly: One barrier to adopting new tools is the learning curve. Kanban Tasks was designed to feel like a natural part of Google Workspace, meaning if you know how to use Gmail and Google Tasks, you can quickly get the hang of Kanban Tasks (Kanban Tasks - A native Kanban Board in your Google Workspace). This reduces training overhead. Its interface uses familiar design language (cards, drag-and-drop, checklists) so team members will find it intuitive.
  • Automated Organization: Features like automated “Due Today” and “Due This Week” lists are built in (Kanban Tasks - A native Kanban Board in your Google Workspace). The extension can automatically gather tasks that have due dates approaching, giving users a quick view of what’s urgent. This bridges a gap between Kanban and traditional to-do list urgency, ensuring that even in a flow-based system, deadlines aren’t missed.
  • Integrations with Calendar: Because tasks are in Google Tasks, due dates appear in Google Calendar if you enable Tasks view. This means if you assign a due date to a Kanban card, the person responsible can see it on their Calendar – a gentle reminder tied into their normal time management tool.
  • Security and Privacy: Using an extension within Google means your data stays within your Google account (and the extension’s cloud, as needed). For companies concerned about adopting a third-party SaaS for Kanban, this can be reassuring – it leverages Google’s robust security model and APIs. Always review the extension’s permissions and data policy, but Tooling Studio positions itself as enhancing Google Workspace, which is a plus for IT approval.

In practical terms, what does this integration accomplish? It lowers the barrier for your team to use Kanban. If you decided Kanban is right but worry “Will the team remember to update the board?”, embedding the board in Gmail (where they spend a good chunk of their day) is an elegant solution. It turns project management from a separate destination into a part of the normal workflow. Additionally, it can centralize information – emails, tasks, files (Google Drive attachments on cards) – all linked to the relevant card on the board.

For example, a sales team working on deals could use Kanban Tasks to track deal stages (Lead, Prospect, Proposal, Negotiation, Won). Emails from a client can be attached to the card, the proposal document from Drive can be linked, and next steps listed in a checklist on the card. Team members can add comments like “Client asked for an updated quote, I’ll handle that.” Anyone viewing the board has the full context without searching through separate systems. And since it’s Google-integrated, when the sales meeting happens in Google Meet, the team can quickly pull up the Kanban board in Gmail to review deal statuses live.

In short, Tooling Studio’s Kanban Tasks helps you implement the Kanban method in a frictionless way if you’re already in the Google ecosystem. It’s a modern example of how project management tooling is evolving to meet teams where they are, rather than forcing teams to adapt to the tool. By simplifying adoption, it lets you focus on the core work and collaboration rather than the mechanics of the software.

Tips and Best Practices for Transitioning Your Team

Adopting a new project management approach, whether Kanban or Gantt, is a change management exercise. Here are some best practices to ensure a smooth transition:

  • Educate and Explain Why: Don’t just impose a new method; explain the rationale and benefits. For instance, share how Kanban has been shown to increase throughput by preventing overloading (Kanban vs. Gantt Charts: Which Is Best for Your Team?), or how a Gantt chart can clarify roles and deadlines to reduce confusion (Kanban vs. Gantt Charts: Which Is Best for Your Team?). When people understand the why, they’re more likely to buy in. Consider a short training session or workshop. Use examples from Part 2 (e.g., “XYZ Company managed their marketing campaigns with Kanban and saw 20% faster content delivery” – if you have such data or references) or even run a short demo with a trivial project to show the difference.

  • Start Small: It’s often wise to pilot the new approach on a small scale. Perhaps try Kanban for one sprint or on one project, or create a mini Gantt for just the next phase of the project rather than an entire year. This allows the team to experiment and provide feedback. It also produces quick wins that you can showcase. If the pilot fails or runs into issues, you can adjust before rolling out broadly.

  • Assign a Champion or Facilitator: Especially for Kanban, having someone take ownership of the process initially helps. This could be a project manager, Scrum master, or any team member enthusiastic about the method. Their role is to ensure the board or chart is maintained and to remind/coach others in using it. For example, a Kanban champion might gently remind folks each day to move their cards, or suggest WIP limit adherence when they see it’s breached. A Gantt facilitator might check in on task progress and update the chart accordingly. Over time, this role can fade as the process becomes habitual, but it’s valuable during the transition.

  • Adapt the Process to Your Context: Use the methods as frameworks, not rigid rules. If a particular practice isn’t working for your team, adjust it. Maybe the team finds the Kanban board needs an extra column, or that daily stand-ups could be every other day. It’s okay to tailor the methodology. The goal is effective project delivery and team coordination, not dogmatic adherence. Many teams find a blend that works (Scrumban, anyone?).

  • Communicate Progress and Celebrate Wins: Use the visibility of the new system to your advantage. With Kanban, when the team achieves a steady flow or clears a backlog, celebrate that – “We resolved 50 support tickets this week, which is 20% more than before, thanks to our improved flow (Kanban vs. Gantt Charts: Which Is Best for Your Team?).” With Gantt, if a milestone is hit on time or early, acknowledge it. Positive reinforcement helps entrench the new method as people see tangible results. Also, communicate these wins to stakeholders – it builds confidence in the approach.

  • Be Patient with the Learning Curve: There might be initial resistance or mistakes (like forgetting to update the board, or underestimating tasks on the Gantt). This is normal. Provide support and don’t punish slip-ups in the process usage. For example, if someone forgets to move a Kanban card and as a result a task gets overlooked, treat it as a learning opportunity to improve the team’s discipline or maybe refine the process (perhaps automated reminders could help). If initial time estimates on the Gantt were off, adjust them and use that insight for future estimating. Show the team that the process is serving them, and they have leeway to grow into it.

  • Address Cultural Shifts Openly: Kanban in particular shifts how work is assigned (it becomes pull-based). Some team members or managers might feel uneasy with less formal assignment – talk about it. Managers might worry about losing control; assure them that Kanban offers more visibility and that they still play a key role in prioritization and clearing blockers. Team members might worry about competition or judgment (Kanban can make individual contributions visible). Emphasize that it’s about team throughput, not individual tracking. Indeed, avoid using the board to micro-measure individuals – it’s meant to improve system flow, not as an employee scoreboard.

  • Utilize Metrics to Refine (but not to Blame): As your team settles in, start looking at metrics to continuously improve. For Kanban, track things like average cycle time or how consistent the throughput is. If variability is high, investigate why (it could be external dependencies or certain work types taking longer). For Gantt, track if tasks are completing on schedule or if some resources are always overbooked. Use these data points in retrospectives or planning adjustments. The key is to use metrics to improve the process, not to punish people for not meeting a number. Creating a blameless culture around these metrics encourages honesty and improvement – e.g., if cycle times are long because code review is a bottleneck, no one should feel blamed; rather the team together decides maybe to train more code reviewers or adjust WIP.

  • Keep Stakeholders in the Loop: If you’re moving an organization or client to a new model, manage their expectations. For instance, if you shift from a detailed Gantt contract to an agile Kanban delivery for a client, explain how they will see progress (perhaps more frequent deliverables instead of a big bang) and how they can still control priorities even if exact dates for everything aren’t preset. Many stakeholders will appreciate frequent visible progress over a static plan (Kanban vs. Gantt Charts: Which Is Best for Your Team?), but you need to bring them along in understanding the new cadence. Conversely, if you introduce a Gantt plan in a previously ad-hoc environment, reassure stakeholders (or upper management) that this is to bring clarity and not to add bureaucracy – show how it will help predict delivery and align everyone.

  • Plan Retrospectives on the Method Itself: After a few weeks of using Kanban or Gantt, have a retrospective focusing on the process. Ask the team what’s working and what’s not. You might discover, for example, that the Kanban WIP limit of 2 per person is too low for one role, because sometimes they need to juggle 3 small tasks – so you adjust it. Or maybe the Gantt chart’s update frequency is an issue – team members might prefer updating progress bi-weekly instead of weekly because tasks don’t show meaningful progress in just 5 days. Tweak accordingly. This not only improves the process but also gives the team ownership in shaping it, which increases buy-in.

By following these practices, you’ll increase the likelihood that your team not only adopts the new methodology but truly embraces it to the point where it becomes second nature. The goal is to reach a stage where the conversation shifts from the mechanics of Kanban/Gantt to the actual work content – that means the method is working as a transparent vessel for getting work done, which is the ultimate aim.

Conclusion

Choosing between Kanban and Gantt for project planning doesn’t have to be a daunting “either-or” decision. As we’ve seen, each method has unique strengths: Kanban offers agility, continuous flow, and focus, making it ideal for teams that value flexibility and ongoing delivery. Gantt provides structure, foresight, and coordination, suiting projects where deadlines and complex sequences are at the forefront. By understanding the nature of your project and your team, you can select the approach (or combination) that aligns with your needs.

Modern project management is often about balance – balancing adaptability with predictability, individual empowerment with collective coordination. Many successful teams find a hybrid path, using Kanban to drive daily work and Gantt to map big pictures, effectively enjoying the benefits of both (Kanban Boards vs Gantt Charts: What to use? | Cloud Coach). Tools are evolving to support this duality, and organizations are increasingly open to mixing methodologies as long as the work gets done effectively.

One encouraging takeaway is that these methods are not in conflict so much as in conversation. A Kanban board and a Gantt chart can coexist, and data can flow between them in contemporary tools (as evidenced by integrations and platforms that offer multiple views for the same project data). So, the conversation isn’t “Should we abandon Gantt for Kanban?” but rather “Where can Kanban improve our workflow, and where do we still need a timeline?” or vice versa.

For teams leaning into agility, adopting Kanban can be a transformative step – and doing so within your existing SaaS tools (like using Kanban boards inside Google Workspace via Tooling Studio’s Kanban Tasks) can minimize disruption and accelerate benefits. Scientific and empirical evidence backs the efficacy of Kanban in improving throughput and efficiency when implemented with discipline (Kanban vs. Gantt Charts: Which Is Best for Your Team?) ( Working with WIP limits for kanban | Atlassian ). Meanwhile, decades of project management practice and research validate the importance of scheduling and dependency management for achieving on-time project delivery – strengths of the Gantt approach (Kanban vs. Gantt Charts: Which Is Best for Your Team?) (Gantt Chart vs. Kanban Board: Pros, Cons, Similarities & Differences).

Ultimately, the best methodology is the one that your team actually uses and that helps surface issues early so you can solve them. Both Kanban and Gantt, each in their own way, make work visible – Kanban visualizes workflow and work in progress, Gantt visualizes time and sequence. Visibility is half the battle in project management, bringing problems out of the shadows. The other half is using that visibility to adapt and control the project to success. If you’ve followed this three-part series, you’re equipped with knowledge to achieve both: you know what Kanban and Gantt entail, when to use them, and how to implement them in practice.

So, whether you start moving cards on a Kanban board or drawing bars on a Gantt timeline, you’re taking a proactive step toward better project outcomes. Continuously monitor, learn, and refine your approach. Your team’s needs may evolve – and you can evolve your mix of methodologies accordingly. In the end, effective project planning is less about adhering strictly to a methodology and more about empowering your team to deliver value in a predictable, efficient manner. Kanban and Gantt are two proven paths to that destination. Choose the path (or paths) that make sense, guide your team onto it with the strategies we’ve discussed, and you’ll be well on your way to project planning mastery.

Kanban Tasks
Shared Kanban Boards with your Team
Start using Kanban Tasks for free. No credit card required. Just sign up with your Google Account and start managing your tasks in a Kanban Board directly in your Google Workspace.